ISO 9001 Certificate Number: 0350124Q30499R1Sjovi@merydom.com
MERYDOM VERIFIED REPLACEMENT DATABASE

INA VLA 20 Replacement Slewing Bearings

Four Point Contact Ball series for certified model cross-reference. 7 MERYDOM models in this series are published at Level 3 Engineering Verified.

MERYDOM Factory VerifiedEngineering certification · Rev 1.0
7Verified models
1Series
1Bearing structures
1Gear configurations
DATABASE COVERAGE

Verified catalog coverage

Overall outside diameter
503.3–1,198.1 mm
Overall inside diameter
304–984 mm
Overall height
Not published
Bearing structure

Four Point Contact Ball

Gear options

External gear

LEVEL 3 · ENGINEERING VERIFIED

Verified model list

7 Verified models · 20 / page

MERYDOM modelTypeOD × ID × HMounting holesGearOpen product
VLA 200414 NINA · VLA 20 Series referenceExternal gearFour Point Contact Ball503.3 × 304 × — mm10 / 12 outer / innerModule 5 (source 5) · 99 teethSpecifications
VLA 200544 NINA · VLA 20 Series referenceExternal gearFour Point Contact Ball640.3 × 434 × — mm14 / 14 outer / innerModule 6 (source 6) · 105 teethSpecifications
VLA 200644 NINA · VLA 20 Series referenceExternal gearFour Point Contact Ball742.3 × 534 × — mm16 / 16 outer / innerModule 6 (source 6) · 122 teethSpecifications
VLA 200744 NINA · VLA 20 Series referenceExternal gearFour Point Contact Ball838.1 × 634 × — mm18 / 16 outer / innerModule 6 (source 6) · 138 teethSpecifications
VLA 200844 NINA · VLA 20 Series referenceExternal gearFour Point Contact Ball950.1 × 734 × — mm18 / 18 outer / innerModule 8 (source 8) · 117 teethSpecifications
VLA 200944 NINA · VLA 20 Series referenceExternal gearFour Point Contact Ball1,046.1 × 834 × — mm20 / 20 outer / innerModule 8 (source 8) · 129 teethSpecifications
VLA 201094 NINA · VLA 20 Series referenceExternal gearFour Point Contact Ball1,198.1 × 984 × — mm22 / 20 outer / innerModule 8 (source 8) · 148 teethSpecifications
MERYDOM ENGINEERING

Confirm price, delivery and application suitability

Send the reference model, quantity, application, operating conditions and any available drawing for final engineering review.

Request a replacement quote